推荐 vue vxe-gantt 最好用的甘特图,功能全面的甘特图组件

1,630 阅读15分钟

推荐 vue vxe-gantt 最好用的甘特图,功能全面的甘特图组件

查看官网:vxeui.com
Github:github.com/x-extends/v…
Gitee:gitee.com/x-extends/v…

npm install vxe-pc-ui@4.10.47 vxe-table@4.17.27 vxe-gantt@4.14
// ...
import VxeUIAll from 'vxe-pc-ui'
 import 'vxe-pc-ui/es/style.css'

 import VxeUITable from 'vxe-table'
 import 'vxe-table/es/style.css'

 import VxeUIGantt from 'vxe-gantt'
 import 'vxe-gantt/lib/style.css'
 // ...

 createApp(App).use(VxeUIAll).use(VxeUITable).use(VxeUIGantt).mount('#app')
 // ...

ExtendGanttChart.gif

基础功能

image

<template>
  <div>
    <vxe-gantt v-bind="ganttOptions"></vxe-gantt>
  </div>
</template>

<script setup>
import { reactive } from 'vue'

const ganttOptions = reactive({
  columns: [
    { field: 'name', title: '任务名称' },
    { field: 'start', title: '开始时间', width: 100 },
    { field: 'end', title: '结束时间', width: 100 }
  ],
  data: [
    { id: 10002, name: '城市道路修理进度', start: '2024-03-03', end: '2024-03-08', progress: 10 },
    { id: 10004, name: '超级大工程', start: '2024-03-05', end: '2024-03-11', progress: 15 },
    { id: 10006, name: '一个小目标项目', start: '2024-03-10', end: '2024-03-21', progress: 5 },
    { id: 10007, name: '某某计划', start: '2024-03-15', end: '2024-03-24', progress: 70 },
    { id: 10008, name: '某某科技项目', start: '2024-03-20', end: '2024-03-29', progress: 50 }
  ]
})
</script>

显示任务进度

通过 task-bar-config.showProgress 显示任务进度

image

<template>
  <div>
    <vxe-gantt v-bind="ganttOptions"></vxe-gantt>
  </div>
</template>

<script setup>
import { reactive } from 'vue'

const ganttOptions = reactive({
  border: true,
  columnConfig: {
    resizable: true
  },
  taskBarConfig: {
    showProgress: true
  },
  columns: [
    { field: 'title', title: '任务名称' },
    { field: 'start', title: '开始时间', width: 100 },
    { field: 'end', title: '结束时间', width: 100 }
  ],
  data: [
    { id: 10001, title: 'A项目', start: '2024-03-01', end: '2024-03-04', progress: 3 },
    { id: 10002, title: '城市道路修理进度', start: '2024-03-03', end: '2024-03-08', progress: 10 },
    { id: 10003, title: 'B大工程', start: '2024-03-03', end: '2024-03-11', progress: 90 },
    { id: 10004, title: '超级大工程', start: '2024-03-05', end: '2024-03-11', progress: 15 },
    { id: 10005, title: '地球净化项目', start: '2024-03-08', end: '2024-03-15', progress: 100 },
    { id: 10006, title: '一个小目标项目', start: '2024-03-10', end: '2024-03-21', progress: 5 },
    { id: 10007, title: '某某计划', start: '2024-03-15', end: '2024-03-24', progress: 70 },
    { id: 10008, title: '某某科技项目', start: '2024-03-20', end: '2024-03-29', progress: 50 },
    { id: 10009, title: '地铁建设工程', start: '2024-03-19', end: '2024-03-20', progress: 5 },
    { id: 10010, title: '铁路修建计划', start: '2024-03-12', end: '2024-03-20', progress: 10 },
    { id: 10011, title: '蓝天计划', start: '2024-03-02', end: '2024-03-42', progress: 0 },
    { id: 10012, title: 'C计划', start: '2024-03-05', end: '2024-03-14', progress: 90 }
  ]
})
</script>

设置颜色

image

<template>
  <div>
    <vxe-gantt v-bind="ganttOptions"></vxe-gantt>
  </div>
</template>

<script setup>
import { reactive } from 'vue'

const ganttOptions = reactive({
  border: true,
  taskBarConfig: {
    showProgress: true,
    barStyle: {
      round: true,
      bgColor: '#fca60b',
      completedBgColor: '#65c16f'
    }
  },
  columns: [
    { field: 'name', title: '任务名称' },
    { field: 'start', title: '开始时间', width: 100 },
    { field: 'end', title: '结束时间', width: 100 }
  ],
  data: [
    { id: 10001, name: 'A项目', start: '2024-03-01', end: '2024-03-04', progress: 3 },
    { id: 10002, name: '城市道路修理进度', start: '2024-03-03', end: '2024-03-08', progress: 10 },
    { id: 10003, name: 'B大工程', start: '2024-03-03', end: '2024-03-11', progress: 90 },
    { id: 10004, name: '超级大工程', start: '2024-03-05', end: '2024-03-11', progress: 15 },
    { id: 10005, name: '地球净化项目', start: '2024-03-08', end: '2024-03-15', progress: 100 },
    { id: 10006, name: '一个小目标项目', start: '2024-03-10', end: '2024-03-21', progress: 5 },
    { id: 10007, name: '某某计划', start: '2024-03-15', end: '2024-03-24', progress: 70 },
    { id: 10008, name: '某某科技项目', start: '2024-03-20', end: '2024-03-29', progress: 50 },
    { id: 10009, name: '地铁建设工程', start: '2024-03-19', end: '2024-03-20', progress: 5 },
    { id: 10010, name: '铁路修建计划', start: '2024-03-12', end: '2024-03-20', progress: 10 }
  ]
})
</script>

单选框

image

<template>
  <div>
    <vxe-gantt v-bind="ganttOptions"></vxe-gantt>
  </div>
</template>

<script setup>
import { reactive } from 'vue'

const ganttOptions = reactive({
  border: true,
  height: 300,
  rowConfig: {
    isHover: true
  },
  radioConfig: {
    labelField: 'title',
    highlight: true
  },
  taskBarConfig: {
    showProgress: true,
    showContent: true,
    barStyle: {
      round: true,
      bgColor: '#fca60b',
      completedBgColor: '#65c16f'
    }
  },
  taskViewConfig: {
    tableStyle: {
      width: 480
    }
  },
  columns: [
    { type: 'radio', title: '任务名称' },
    { field: 'start', title: '开始时间', width: 100 },
    { field: 'end', title: '结束时间', width: 100 }
  ],
  data: [
    { id: 10001, title: 'A项目', start: '2024-03-01', end: '2024-03-04', progress: 3 },
    { id: 10002, title: '城市道路修理进度', start: '2024-03-03', end: '2024-03-08', progress: 10 },
    { id: 10003, title: 'B大工程', start: '2024-03-03', end: '2024-03-11', progress: 90 },
    { id: 10004, title: '超级大工程', start: '2024-03-05', end: '2024-03-11', progress: 15 },
    { id: 10005, title: '地球净化项目', start: '2024-03-08', end: '2024-03-15', progress: 100 },
    { id: 10006, title: '一个小目标项目', start: '2024-03-10', end: '2024-03-21', progress: 5 },
    { id: 10007, title: '某某计划', start: '2024-03-15', end: '2024-03-24', progress: 70 },
    { id: 10008, title: '某某科技项目', start: '2024-03-20', end: '2024-03-29', progress: 50 },
    { id: 10009, title: '地铁建设工程', start: '2024-03-19', end: '2024-03-20', progress: 5 },
    { id: 10010, title: '铁路修建计划', start: '2024-03-12', end: '2024-03-20', progress: 10 }
  ]
})
</script>

复选框

image

<template>
  <div>
    <vxe-gantt v-bind="ganttOptions"></vxe-gantt>
  </div>
</template>

<script setup>
import { reactive } from 'vue'

const ganttOptions = reactive({
  border: true,
  height: 500,
  rowConfig: {
    isHover: true
  },
  checkboxConfig: {
    labelField: 'title',
    highlight: true
  },
  taskBarConfig: {
    showProgress: true,
    showContent: true,
    barStyle: {
      round: true,
      bgColor: '#fca60b',
      completedBgColor: '#65c16f'
    }
  },
  taskViewConfig: {
    tableStyle: {
      width: 480
    }
  },
  columns: [
    { type: 'checkbox', title: '任务名称' },
    { field: 'start', title: '开始时间', width: 100 },
    { field: 'end', title: '结束时间', width: 100 }
  ],
  data: [
    { id: 10001, title: 'A项目', start: '2024-03-01', end: '2024-03-04', progress: 3 },
    { id: 10002, title: '城市道路修理进度', start: '2024-03-03', end: '2024-03-08', progress: 10 },
    { id: 10003, title: 'B大工程', start: '2024-03-03', end: '2024-03-11', progress: 90 },
    { id: 10004, title: '超级大工程', start: '2024-03-05', end: '2024-03-11', progress: 15 },
    { id: 10005, title: '地球净化项目', start: '2024-03-08', end: '2024-03-15', progress: 100 },
    { id: 10006, title: '一个小目标项目', start: '2024-03-10', end: '2024-03-21', progress: 5 },
    { id: 10007, title: '某某计划', start: '2024-03-15', end: '2024-03-24', progress: 70 },
    { id: 10008, title: '某某科技项目', start: '2024-03-20', end: '2024-03-29', progress: 50 },
    { id: 10009, title: '地铁建设工程', start: '2024-03-19', end: '2024-03-20', progress: 5 },
    { id: 10010, title: '铁路修建计划', start: '2024-03-12', end: '2024-03-20', progress: 10 }
  ]
})
</script>

子任务

image

<template>
  <div>
    <vxe-gantt v-bind="ganttOptions"></vxe-gantt>
  </div>
</template>

<script setup>
import { reactive } from 'vue'

const ganttOptions = reactive({
  border: true,
  stripe: true,
  treeConfig: {
    transform: true,
    rowField: 'id',
    parentField: 'parentId'
  },
  taskBarConfig: {
    showProgress: true,
    showContent: true
  },
  taskViewConfig: {
    tableStyle: {
      width: 480
    }
  },
  columns: [
    { type: 'seq', width: 70 },
    { field: 'title', title: '任务名称', treeNode: true },
    { field: 'start', title: '开始时间', width: 100 },
    { field: 'end', title: '结束时间', width: 100 }
  ],
  data: [
    { id: 10001, parentId: null, title: 'A项目', start: '2024-03-01', end: '2024-03-04', progress: 3 },
    { id: 10002, parentId: 10001, title: '城市道路修理进度', start: '2024-03-03', end: '2024-03-08', progress: 10 },
    { id: 10003, parentId: null, title: 'B大工程', start: '2024-03-03', end: '2024-03-11', progress: 90 },
    { id: 10004, parentId: 10003, title: '超级大工程', start: '2024-03-05', end: '2024-03-11', progress: 15 },
    { id: 10005, parentId: 10003, title: '地球净化项目', start: '2024-03-08', end: '2024-03-15', progress: 100 },
    { id: 10006, parentId: 10003, title: '一个小目标项目', start: '2024-03-10', end: '2024-03-21', progress: 0 },
    { id: 10007, parentId: 10005, title: '某某计划', start: '2024-03-15', end: '2024-03-24', progress: 70 },
    { id: 10008, parentId: null, title: '某某科技项目', start: '2024-03-20', end: '2024-03-29', progress: 50 },
    { id: 10009, parentId: 10008, title: '地铁建设工程', start: '2024-03-19', end: '2024-03-20', progress: 5 },
    { id: 10010, parentId: 10008, title: '公寓装修计划2', start: '2024-03-12', end: '2024-03-20', progress: 30 },
    { id: 10011, parentId: 10008, title: '两个小目标工程', start: '2024-03-01', end: '2024-03-04', progress: 20 },
    { id: 10012, parentId: null, title: '蓝天计划', start: '2024-03-02', end: '2024-03-08', progress: 50 },
    { id: 10013, parentId: 10010, title: 'C大项目', start: '2024-03-08', end: '2024-03-11', progress: 10 },
    { id: 10014, parentId: 10010, title: 'H计划', start: '2024-03-12', end: '2024-03-16', progress: 100 },
    { id: 10015, parentId: 10011, title: '铁路修建计划', start: '2024-03-05', end: '2024-03-06', progress: 0 },
    { id: 10016, parentId: 10011, title: 'D项目', start: '2024-03-06', end: '2024-03-11', progress: 10 },
    { id: 10017, parentId: 10011, title: '海外改造工程', start: '2024-03-08', end: '2024-03-09', progress: 0 },
    { id: 10018, parentId: null, title: 'Z计划', start: '2024-03-24', end: '2024-03-26', progress: 80 },
    { id: 10019, parentId: 10018, title: 'F工程', start: '2024-03-20', end: '2024-03-28', progress: 10 },
    { id: 10020, parentId: 10018, title: '投资大项目', start: '2024-03-23', end: '2024-03-28', progress: 60 },
    { id: 10021, parentId: 10018, title: 'X计划', start: '2024-03-16', end: '2024-03-25', progress: 10 },
    { id: 10022, parentId: null, title: '上天计划', start: '2024-03-05', end: '2024-03-24', progress: 0 },
    { id: 10023, parentId: null, title: 'G项目', start: '2024-03-08', end: '2024-03-28', progress: 5 },
    { id: 10024, parentId: 10023, title: '下地计划', start: '2024-03-09', end: '2024-03-16', progress: 50 }
  ]
})
</script>

查询表单

image

<template>
  <div>
    <vxe-gantt v-bind="ganttOptions" v-on="ganttEvents"></vxe-gantt>
  </div>
</template>

<script setup>
import { reactive } from 'vue'

const ganttOptions = reactive({
  showOverflow: true,
  border: true,
  height: 500,
  taskBarConfig: {
    showProgress: true,
    showContent: true,
    barStyle: {
      round: true,
      bgColor: '#fca60b',
      completedBgColor: '#65c16f'
    }
  },
  taskViewConfig: {
    tableStyle: {
      width: 480
    }
  },
  formConfig: {
    data: {
      title: '',
      start: '',
      end: ''
    },
    items: [
      { field: 'title', title: '任务名称', itemRender: { name: 'VxeInput' } },
      { field: 'start', title: '开始时间', itemRender: { name: 'VxeDatePicker' } },
      { field: 'end', title: '结束时间', itemRender: { name: 'VxeDatePicker' } },
      {
        itemRender: {
          name: 'VxeButtonGroup',
          options: [
            { type: 'submit', content: '搜索', status: 'primary' },
            { type: 'reset', content: '重置' }
          ]
        }
      }
    ]
  },
  columns: [
    { type: 'seq', width: 70 },
    { field: 'title', title: '任务名称' },
    { field: 'start', title: '开始时间', width: 100 },
    { field: 'end', title: '结束时间', width: 100 }
  ],
  data: [
    { id: 10001, title: 'A项目', start: '2024-03-01', end: '2024-03-04', progress: 3 },
    { id: 10002, title: '城市道路修理进度', start: '2024-03-03', end: '2024-03-08', progress: 10 },
    { id: 10003, title: 'B大工程', start: '2024-03-03', end: '2024-03-11', progress: 90 },
    { id: 10004, title: '超级大工程', start: '2024-03-05', end: '2024-03-11', progress: 15 },
    { id: 10005, title: '地球净化项目', start: '2024-03-08', end: '2024-03-15', progress: 100 },
    { id: 10006, title: '一个小目标项目', start: '2024-03-10', end: '2024-03-21', progress: 5 },
    { id: 10007, title: '某某计划', start: '2024-03-15', end: '2024-03-24', progress: 70 },
    { id: 10008, title: '某某科技项目', start: '2024-03-20', end: '2024-03-29', progress: 50 },
    { id: 10009, title: '地铁建设工程', start: '2024-03-19', end: '2024-03-20', progress: 5 },
    { id: 10010, title: '铁路修建计划', start: '2024-03-12', end: '2024-03-20', progress: 10 }
  ]
})

const ganttEvents = {
  formSubmit () {
    console.log('form submit')
  },
  formReset () {
    console.log('form reset')
  }
}
</script>

数据分页

image

<template>
  <div>
    <vxe-gantt v-bind="ganttOptions" v-on="ganttEvents"></vxe-gantt>
  </div>
</template>

<script setup>
import { reactive } from 'vue'

const allList = [
  { id: 10001, title: 'A项目', start: '2024-03-01', end: '2024-03-04', progress: 3 },
  { id: 10002, title: '城市道路修理进度', start: '2024-03-03', end: '2024-03-08', progress: 10 },
  { id: 10003, title: 'B大工程', start: '2024-03-03', end: '2024-03-11', progress: 90 },
  { id: 10004, title: '超级大工程', start: '2024-03-05', end: '2024-03-11', progress: 15 },
  { id: 10005, title: '地球净化项目', start: '2024-03-08', end: '2024-03-15', progress: 100 },
  { id: 10006, title: '一个小目标项目', start: '2024-03-10', end: '2024-03-21', progress: 0 },
  { id: 10007, title: '某某计划', start: '2024-03-15', end: '2024-03-24', progress: 70 },
  { id: 10008, title: '某某科技项目', start: '2024-03-20', end: '2024-03-29', progress: 50 },
  { id: 10009, title: '地铁建设工程', start: '2024-03-19', end: '2024-03-20', progress: 5 },
  { id: 10010, title: '公寓装修计划2', start: '2024-03-12', end: '2024-03-20', progress: 30 },
  { id: 10011, title: '两个小目标工程', start: '2024-03-01', end: '2024-03-04', progress: 20 },
  { id: 10012, title: '蓝天计划', start: '2024-03-02', end: '2024-03-08', progress: 50 },
  { id: 10013, title: 'C大项目', start: '2024-03-08', end: '2024-03-11', progress: 10 },
  { id: 10014, title: 'H计划', start: '2024-03-12', end: '2024-03-16', progress: 100 },
  { id: 10015, title: '铁路修建计划', start: '2024-03-05', end: '2024-03-06', progress: 0 },
  { id: 10016, title: 'D项目', start: '2024-03-06', end: '2024-03-11', progress: 10 },
  { id: 10017, title: '海外改造工程', start: '2024-03-08', end: '2024-03-09', progress: 0 },
  { id: 10018, title: 'Z计划', start: '2024-03-24', end: '2024-03-26', progress: 80 },
  { id: 10019, title: 'F工程', start: '2024-03-20', end: '2024-03-28', progress: 10 },
  { id: 10020, title: '投资大项目', start: '2024-03-23', end: '2024-03-28', progress: 60 },
  { id: 10021, title: 'X计划', start: '2024-03-16', end: '2024-03-25', progress: 10 },
  { id: 10022, title: '上天计划', start: '2024-03-05', end: '2024-03-24', progress: 0 },
  { id: 10023, title: 'G项目', start: '2024-03-08', end: '2024-03-28', progress: 5 },
  { id: 10024, title: '下地计划', start: '2024-03-09', end: '2024-03-16', progress: 50 }
]

// 模拟前端分页
const handlePageData = () => {
  ganttOptions.loading = true
  setTimeout(() => {
    const { pageSize, currentPage } = pagerVO
    pagerVO.total = allList.length
    ganttOptions.data = allList.slice((currentPage - 1) * pageSize, currentPage * pageSize)
    ganttOptions.loading = false
  }, 100)
}

const pagerVO = reactive({
  total: 0,
  currentPage: 1,
  pageSize: 10
})

const ganttOptions = reactive({
  showOverflow: true,
  border: true,
  loading: false,
  height: 500,
  pagerConfig: pagerVO,
  taskBarConfig: {
    showProgress: true,
    showContent: true
  },
  taskViewConfig: {
    tableStyle: {
      width: 480
    }
  },
  columns: [
    { type: 'seq', width: 70 },
    { field: 'title', title: '任务名称' },
    { field: 'start', title: '开始时间', width: 100 },
    { field: 'end', title: '结束时间', width: 100 }
  ],
  data: []
})

const ganttEvents = {
  pageChange ({ pageSize, currentPage }) {
    pagerVO.currentPage = currentPage
    pagerVO.pageSize = pageSize
    handlePageData()
  }
}

handlePageData()
</script>

里程碑

通过设置 task-bar-milestone-config 和 type=moveable 启用里程碑类型

image.png

拖拽调整日期

通过设置 task-bar-config.moveable 启用拖拽任务条移动日期功能

extend_gantt_chart_gantt_task_drag_drag.gif

extend_gantt_chart_demo_product_list.gif

依赖线

通过设置 task-bar-config.linkCreatable 启用自定义创建依赖线

extend_gantt_chart_demo_create_link.gif

gitee.com/x-extends/v…