CSE3SMT Software Measurement and Testing

72 阅读5分钟

Software ****Measurement and Testing

CSE3SMT

ASSESSMENT ****1 - QUALITY ****RISK ****ASSESSMENT

Teaching ****Period      Semester 2, ****2024

Introduction

Imagine a company is implementing a brand-new software system, and they want to ensure they deliver the highest quality of software to their customers. A primary approach for delivering high quality software is to conduct a quality risk assessment early in the software development lifecycle, to identify project and product risks that can be mitigated (treated) by testing and quality assurance activities. This allows us to strategise and plan an approach to testing and QA that prevents and detects defects much earlier in the lifecycle.

Generative AI can be helpful for brainstorming quality risks, but can we trust it to do the job for us? The aim of this assignment is to:

  1.    Demonstrate your capabilities in conducting a quality risk assessment, and

  2.    Learn the advantages and limitations of using generative AI to identify project and product risks.

You are welcome to use ideas and materials from lecture 2 and lab 2 to support this assignment, and the risk assessment questionnaire that has been provided for lab 2 and the assignment..

Individual Assignment

This is an individual assignment. You are not ****permitted to work in groups when writing your answers to this assignment. However, you are welcome to  brainstorm  risks together with other students, as part group activities associated withs lab 2 and 3.

When submitting the assignment, students are required to submit their own work only. La Trobe University treats plagiarism seriously. When detected, penalties are strictly imposed.  Further information can be found onhttps://www.latrobe.edu.au/students/admin/academic-integrity.

Total Subject Grade Contribution

This assignment contributes a total of 45% to your overall mark for the subject.

Due Date

This assignment is due at end of day (11.59pm) on Sunday 15th  September 2024.

A penalty of 5% per day will be imposed for late assignments, and 代写CSE3SMT Software Measurement and Testing  assignments can be submitted up to 5 days late at most (except in situations where special consideration applies). If you resubmit your assignment after the due date, it will be considered a late submission and will incura 5% penalty per day (except in situations where special consideration applies).

Submission

You are welcome to submit your answers in MS Excel, MS Word or PDF. It is preferable that all work be submitted in one file and that the file not be zipped.

Subject Intended Learning Outcomes

This assignment is designed to contribute towards the following learning outcomes:

•    Relate the multiple industry-based roles involved in modern software testing

AssignmentTasks

The following tasks are mandatory and must be completed for this assignment.

Task 1 - Quality Risk Assessment

In this task, you will co nduct ****a ****quality ****risk ****assessment ****for a chosen customer and system, based on the quality characteristics and sub-characteristics in the ISO/IEC 25010 product quality model.

You are not ****permitted to use generative AI for this task. All ideas and answers must be your own. All answers must be written in your own words.

Complete the following tasks:

  1.    Choose a customer and system as the basis for your quality risk assessment. Specify the customer’s ****name, system name ****(if known), and briefly describe the ****s ystem.

You do not need to submit a customer profile for this task (although you may find the process we followed in lab 1 will support you in understanding your chosen customer).

  1.    Using the ISO/IEC 25010:2023 product quality model, and the risk assessment questionnaire provided in lab 2, identify ****a ****set ****of ****project ****and ****product ****risks ****for your system. For each risk, identify potential impacts, risk levels, and risk mitigations (including preventative and detective testing & QA activities that can mitigate each risk).

Include the following in your risk assessment:

a)   At ****least ****1 ****risk ****per ****sub-characteristic ****from the ISO/IEC 25010:2023 product quality model (i.e. minimum 40 risks). To support the process, read the risk assessment questionnaire, and consider how each characteristic and sub-characteristic might matter to your customer and their stakeholders (e.g., executives, managers, customers, staff, end-users). Please ensure you list the quality characteristic and the sub-characteristic for each risk.

b)   At  least  1  risk  per  project ****risk ****type ****from the risk assessment questionnaire (i.e. minimum 8 project risks).

c)    Identify potential impacts, ****risk levels ****and mitig ations ****for each risk.

d)    Document the above in a risk ****register.

e)    Provide a risk ****matrix to support your assignment of risk level.

f)    Document your assumptions ****(minimum 5 assumptions).

Task 2 - AI-Generated Quality Risks

In this task, you will ****use a generative AI tool to generate quality risks for the same customer and system.

The aim is to find out what types of risks generative AI tools are able to produce, based on their current levels of capability. You do not need to reword or improve the risks or mitigations.

For the same customer and system, use the generative AI tool ****to complete the following tasks:

  1.    Choose a generative AI tool, specifying the name and URL of the tool.

  2.    For the same customer and system, ask the tool to generate:

a.    A set of 40  (minimum) product quality risks. You may need to run a series of prompts to generate a minimum of 40 risks.

b.   A set of 8 (minimum) testing project risks.

c.    Potential risk impacts, risk levels, and risk mitigations including preventative and detective testing and QA activities, for each risk.

d.    Document the above in a risk register.

e.    Document the prompts that were used to generate the above.

Task 3 - Compare the Results

In this task, you will compare the risks you identified, against those that were generated by the AI tool.

You are not ****permitted to use generative AI for this task. All ideas and answers must be your own. All answers must be written in your own words.

  1.    Compare the risks that were identified in tasks 1 and 2, providing answers to the following questions (including rationale/justification for each answer):

a)    Did the AI tool generate any risks that were not included in your risk register?

a.    Would any of the  new  risks have been useful to include in your risk register (e.g., to produce a higher-quality system for the customer)?

b.    Were any of the new risks not useful?

b)   Were any ISO/IEC 25010:2023 product quality sub-characteristics missed by the AI tool?

a.    Which sub-characteristics were missed?

b.    Why do you think they were missed?

c.    Could any of the missing sub-characteristics impact on the quality of the system?

c)    Did the AI tool introduce any new risk types that were not included in the ISO/IEC 25010:2023 product quality model?

a.    Were they useful?

b.    Would they be useful to include in the ISO/IEC 25010 product quality model?

d)   Which approach to risk identification do you think could result in a higher-quality system - task 1, task 2, or a combination?

MarkingRubric-CSE3SMT-Assignment1

Task ****Criteria ****Poor ****(0-2) ****Average ****(3-6) Excellent ****(7-10) Grade & ****Feedback
1Product ****risksCovers few to none of the product qualitysub-characteristics from ISO/IEC25010:2023 product quality model.Risks are generic, poorly specified, or are not related to the given systemModerate attempt. Fewer than 40 risks     identified, or some risks do not relate to    the ISO/IEC 25010 product quality model, are generic, unsuitable, loosely related to the given system, or not well specifiedCovers all 40 product quality sub- characteristics from the ISO/IEC25010:2023 product quality model.All risks are related to the given system, and are well specified 
 CriteriaPoor ****(0-1)Average ****(2)Excellent ****(3)Grade & ****Feedback
 ImpactsFew impacts are specified, or impacts are not suitable for the given riskModerate attempt. Only some impacts are specified, or some are not suitable for the   given risk, system or customerRisk impacts are well-specified, and are well-related to the given system andcustomer 
MitigationsFew mitigations are suitable for the given  risk, or few include both preventative and detective testing & QA approachesModerate attempt. Some mitigations are unsuitable for the given risk, or do notinclude preventative and detective testing & QA approachesAll risk mitigations are suitable, wellspecified, and include both preventative and detective testing & QA approaches 
 CriteriaPoor ****(0)Average ****(1)Excellent ****(2)Grade & ****Feedback
 Project ****risksFew project risks are specified, or risks are not suitable for the given system orcustomerModerate attempt. Only some project risk types are covered, or some are notsuitable for the given system or customerAll 8 project risk types are covered, with all risks well-written, and well-related to the given system and customer 
Risk ****levelsRisk levels are not specified at all, or risk matrix has not been providedModerate attempt. Risk levels are not well specified, or risk matrix is not wellspecifiedRisk levels are well specified, and risk matrix is well structured and suitable 
AssumptionsNo assumptions specifiedFew assumptions submitted, assumptions are not well specified, or are not related    to given system or customerSet of 5 (minimum) well-specifiedassumptions, all being well-related to the given system and customer